Learn, Explore, and See What’s New in Our Fabrication Blog

What happens during production impact testing? What are the latest ASME code updates? How are lethal chemicals transferred? These are just a few of the questions you’ll find answers to in our fabrication blog. Browse and share these articles, and as always, let us know how we can help.

a crack in an eld on a silver metal

How to Prevent Cracks in Welding? A Guide to Help Stop Welding Cracks

Welding is essential to many industries, from construction and manufacturing to automotive repair. However, one of the most frustrating issues professionals encounter is cracking in welds. These cracks compromise the project’s structural integrity and can lead to costly rework or even catastrophic failure. Fortunately, with the right strategies and knowledge, welding cracks can be minimized … Continue reading "How to Prevent Cracks in Welding? A Guide to Help Stop Welding Cracks" ...Read More

a person sanding down a corner of a weld

The Industrial Manufacturing Process: What it is and Why it Matters

Industrial metal fabrication is the driving force behind creating the durable, high-quality products that keep industries moving forward. Picture the towering steel frameworks of buildings, the precise components in machinery, and the metal products the world relies on daily—none of it would be possible without these intricate fabrication processes. But there’s more to this world … Continue reading "The Industrial Manufacturing Process: What it is and Why it Matters" ...Read More

Quarterly Newsletter: Impact Testing (Part 4)

...Read More

A person welding what will become the inside of a pressure vessel.

The Pressure Vessel Fabrication Process: Crafting Reliability and Safety

In industries where high pressure and extreme temperatures are the norms, the integrity and reliability of pressure vessels are paramount. The pressure vessel fabrication process is a complex and meticulous journey involving design, material selection, welding techniques, and rigorous safety measures to ensure these critical components meet the highest standards. Whether you are an industry … Continue reading "The Pressure Vessel Fabrication Process: Crafting Reliability and Safety" ...Read More

Decoding Pressure Vessel Design

Tracing its origins to 1915, the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (the code) has become the established safety standard governing the design, fabrication, and inspection of boilers and pressure vessels, as well as nuclear power plant components during construction. Section VIII, Division I of the code addresses pressure vessels … Continue reading "Decoding Pressure Vessel Design" ...Read More

ASME Section VIII, Division 2

For many fabricators and mechanical engineers ASME Section VIII Division 2 is a mystery. Why? Even though it has been around since its creation in 1968, most engineers and fabricators never get to use it. (1) It takes additional certification and a U2 stamp, (2) additional software for ASME Section VIII Division 2 calculations, (3) … Continue reading "ASME Section VIII, Division 2" ...Read More

A person welding, wearing a welding mask and gloves for safety.

What Causes Porosity in Welding? Understanding and Preventing the Issue

Imagine dedicating hours to a welding project, only to find that your welds are riddled with tiny gas pockets, compromising their integrity and appearance. This scenario is all too familiar for many welders. Porosity in welding refers to trapped gas within the weld metal, weakening the weld and making it more prone to failure. But … Continue reading "What Causes Porosity in Welding? Understanding and Preventing the Issue" ...Read More

A welder works on a piece of metal

Why ASME Pressure Vessel Certification Is a Must-Have for Industry Professionals

Professionals in mechanical engineering and industrial manufacturing know that safety and reliability are non-negotiable when it comes to pressure vessels. The ASME Pressure Vessel Certification is crucial for any fabricator you want to work with. This certification ensures that pressure vessels meet the rigorous standards of the ASME Boiler and Pressure Vessel Code (BPVC), providing … Continue reading "Why ASME Pressure Vessel Certification Is a Must-Have for Industry Professionals" ...Read More

Quarterly Newsletter: Impact Testing (Part 3)

...Read More

Cracking the Code: Packed Column vs. Tray Column for Optimal Results

When you step into the world of chemical engineering, you will begin to unravel the intricacies of packed columns versus tray columns. Crucial for the division of mixtures in many industrial operations, these distinct distillation column types operate on unique principles and showcase varied characteristics. Their pivotal role in the separation processes underlines the importance … Continue reading "Cracking the Code: Packed Column vs. Tray Column for Optimal Results" ...Read More

Definitely a great team effort between HFS and Boardman to get this knocked out quickly with no mistakes.  Appreciate you and your teams help getting this across the finish line!

Reliability & Inspection

HF Sinclair

The BFS team is very responsive, conduct quality work, and produce detailed reports.  They have excellent level of support, responsiveness and quality work!

Construction Manager

Vestas

“I am glad you guys do the newsletters. Educate AND do the work. Most don’t do this. It is similar to what Dave Ramsay says about looking for a Financial Advisor… look for one with a heart of a teacher.”

Equipment Engineer

Fluor

“I would like to go out of my way to say this is the quickest I have seen a vessel come together. Your ability to manage this on such short notice does not go unnoticed and definitely will earn you some more business. Your professional approach and ability to keep this moving was amazing! I was hoping to see this thing through to the end and see about getting some Guiness world record trophy on our walls.”

Mechanical Engineer

Chevron

“Just wanted to send a quick thank you for sending these newsletters. I really enjoy them and share them with others at the office.”

Project Management

Kestrel Engineering

“Thank you for all your help on this order. Please let your team know that everything Boardman has done for this order has been top notch!”

Mechanical Engineer

Worley

“It was a real pleasure working with you and your team. I wish all vendors would have the same high quality team!”

Expeditor

Worley

“Your engineering team has gone above and beyond for our current projects. We have thrown quite a few changes at them and they have dug into code details that are not normally required to satisfy the requests of some of our SME folks. They are always available, even when they’re off or on weekends to help answer any urgent questions. I tried to find something we can do to help recognize the extra efforts, but could not come up with anything. Thank you for the efforts and willingness to work with us so closely on these urgent jobs.”

Mechanical Engineer

Chevron

“It was great pleasure and it was sure a huge effort pulled by Boardman organization. Promoting such events are very helpful to the engineering community in general but very few places realize the same. Boardman being exceptional and very hospitable place to be for this event. I want to say Thank You Boardman!”

Mechanical Engineer

Chevron

“The class was an excellent use of time and has increased my industry knowledge. Good mix of both end user and design engineer attendance which drove discussions into new directions. I will highly recommend to my firm for attendance next year.”

Mechanical Engineer

S&B Engineering

“Thank you and everyone at Boardman for an excellent 2 days of training and exceptional hospitality. While it gave me the opportunity to get out of the office for 2 days, it was also a great training/refreshing opportunity for me and on top of it, I got to visit your facility, which I think is quite impressive. Hope to have some more work in your shop soon. There are several folks here who were amazed when I told them that you guys had welding stations set up and each of us got to weld and try out as many as 4 welding processes. Please keep me posted on the next training session.”

Vessel Engineer

Burns & McDonnell

“I just wanted to say thank you very much to you and your team for all of the work that you put in to make this seminar possible. I was very impressed with the quality of the seminar. It is the best technical seminars I have been to. The classroom intermixed with shop time made the experience a one of a kind. The instructor is a wealth of knowledge. I was also very impressed with the care and concern that you had for those attending. You guys have superb customer service. I really appreciate the opportunity and it means a lot.”

Mechanical Engineer

MKEC Engineering

“Thank you guys very much for putting together the Pressure Vessel Fabrication presentation. I’ve heard great things from about the vessels currently in your shop. We look forward to building a long lasting relationship.”

Corrosion/Materials Engineer

Phillips 66

“The Boardman team’s expertise, experience and processes made our project easy. The communication between their team and mine ensured our project ran smoothly. I knew I could count on the work they sent. I look forward to working with a company that communicates well and takes pride in their work.”

Mechanical Engineer

Worley

“I just wanted to share some photos of the Deisobutonizer being lifted into place yesterday. None of this would have been possible without your efforts in both the manufacturing and transport of the tower. This is the largest structure on the project and you all deserve a lot of credit for this milestone. It was not only a pleasure to work with you all on this fabrication and hauling to site of the monstrosity but it was a privilege to have such a team behind us to make this happen with no incident and what on the surface seemed child’s play. You all should be very proud of yourselves and your collective teams and firms, without you none of this was even conceivable.”

Materials & Logistics

Cenovus Superior Refinery

“I worked with Boardman on a project involving multiple vessels. The team’s impressive knowledge of ASME Section VIII Div 1 was critical to the success of the project. I enjoyed seeing the vessels in person during an engineering design course at the Boardman facility. The team always kept me in the loop and ensured quality work from fabrication through shipment.”

Mechanical Engineer

Black & Veatch

“Boardman was great to work with from the initial bidding phase through procurement. It is clear that they value relationships and are very professional. I have worked with Boardman in the past, and they continue to meet the requirements of our projects and owners. I value our relationship and hope to continue to work with them in the future.”

Sr. Procurement Manager

Black & Veatch

“Thank you for the high level of communication on this project and the effort put into making things work. So far this project has gone smoothly and our efforts have not gone unnoticed. Specifically the time invested in making sure the anchor bolt pattern matched their existing foundation. Not sure if it is my place to say but you are highly regarded at this refinery.”

Mechanical Engineer

Merrick Engineering

“I am continually impressed with the level of quality and professionalism on this project from the beginning.”

Inspector

HF Sinclair

“Boardman was very professional throughout the engineering and design of this vessel. They did a really good job on fabrication.”

Project Manager

Chevron Phillips Chemical